Vendor Name: HP
Exam code: HP2-Z18
Exam Name: Network Infrastructure AIS 2011
Click the link below to get full version
http://www.certifyguide.com/exam/HP2-Z18/
Question:
1
|
Which HP E-Series switch models
display the following prompt in the interface configuration context? (Select
two)
HP Switch (eth-A24)#
A. E8212zl
B. E6600-24G
C. E5412-96GZI
D. E2910-24Gal
E. E350CM8G-POEyI
Answer: A,C
|
Question:
2
|
When Spanning Tree Protocol is
enabled, which devices receive outbound LLDP advertisements from an HP E-Series
switch?
A. those with interfaces in VLAN 1
B. those that receive the switch's
broadcasts
C. those that are directly connected
to the switch
D. those in the LLDP multicast group
E. those not blocked by Spanning Tree
Protocol
Answer: C
|
Question:
3
|
You must assign a friendly name to
port B24 on an HP E5406 zI switch. Given the following prompt, which command
must you enter next to complete this task?
E5406#
A. configure
B. name int b24 <name>
C. interface b2 4
D. manager
Answer: A
|
Question:
4
|
You are at the manager level prompt In
the CLI of an HP E3500 yI switch. Which options are available at this prompt?
(Select two)
A. assign IP address to VLAN interface
B. enable IP routing
C. restart the switch
D. disable ports
E. update software
Answer: C,E
|
Question:
5
|
Which statements are true about the
primary and secondary flash areas of an HP E-Series switch? (Select two)
A. The primary area contains the
switch's operating system, which is automatically copied to the secondary area
whenever the switch is restarted.
B. The switch can be started using the
software stored in either area.
C. The software stored in the primary
area is always used to start the switch.
D. The primary area always contains
the most recent software version; the secondary area contains an earlier version
to be used if the primary version.
E. The software in each area is stored
and managed independently
Answer: B,E
|
Question:
6
|
You make configuration changes to the
running configuration of your HP E3500 yI switch. Which command saves these changes
to your startup configuration?
A. save running-config
B. copy running-config startup-config
C. write memory
D. write config
Answer: C
|
Question:
7
|
Port B1 on an HP ProCurve 5406zI
switch is an untagged member of VLAN 155 and not a tagged member of any VLAN
PortC1is a tagged member of VLAN 155 and an untagged member of VLAN 100. You
issue the following command:
5406zl (config)# no vlan 155
Why do you receive the following
prompt?
The following ports will be moved to
the default VLAN:
Bl Do you want to continue? [y/n]:
A. The CLI always issues this prompt
when deleting a VLAN
B. The CLI will not allow you to
orphan a port
C. The CLI will not delete a VLAN with
any port membership.
D. All ports must be moved to the
default VLAN before you can delete the VLAN.
Answer: D
|
Question:
8
|
Refer to the exhibit below.
You enter the following command at the
switch's CLI:
E5406 (vlan-100) # no untag a24
A. Why does this command fail?
B. PortA24 is not a member of VLAN
100.
C. Port A24 must be a member of at
least one VLAN
D. VLAN 100 must have at least one
port member
E. no untag a24 is an invalid CLI
command
Answer: B
|
Question:
9
|
At the CLI of an HP E2610-24 switch,
you have assigned ports 1-4 to VLAN 50 as untagged members. The E2610 is
connected through port 24 to an E5406 zl switch. All other configuration
parameters on the E2610 are at default settings. The E5406 is configured with a
VLAN 50 IP address of 192.168.50.1/24. IP routing is enabled. It is connected
to the E2610 through port B24, which is a tagged member of VLAN 50 On the
E2610, which command will enable the E5406 to act as a default gateway for VLAN
50 clients?
A. E2610 (config) # vlan 50 ip address
192.168.50.2/24
B. E2610 (config) # ip default-gateway
192.168.50.1
C. E2610 (config) # ip route
192.168.50.0/24 vlan 50
D. E2610 (config) # vlan 50 tag 24
Answer: D
|
Question:
10
|
What is the effect of the following
command entered at the CLI of an HP E3500 yI switch? E3500 (config) # timesync
sntp
A. The switch will use SNTP as its
time synchronization protocol
B. The switch will provide SNTP
services to all connected VLANs.
C. The switch's clock will be
synchronized with a configured SNTP server d.
D. The switch will broadcast for an
SNTP server.
Answer: A
|
No comments:
Post a Comment